Containers for sale

Refrigerated container at a depot, showing its refrigeration machinery, side wall and corner castings.

20ft Refrigerated Shipping Containers for Sale UK

Buying a 20ft refrigerated container

A 20ft refrigerated shipping container, usually called a reefer, provides temperature-controlled storage in a transportable steel container. These units are used for chilled, frozen and other temperature-sensitive goods where a standard dry container would not provide the required internal conditions.

Before buying, check more than the container’s external condition. A reefer needs a suitable electrical supply, clear airflow inside the unit, level support and enough site access for delivery and future movement. If the container may later travel by sea, its structural condition and CSC status also need to match the intended shipment.

A standard 20ft reefer combines an ISO-format Cor-Ten steel structure with insulated internal walls, an aluminium T-bar floor and an integrated refrigeration unit. Cold air is circulated through the floor and around the cargo before returning to the machinery. Blocking that airflow can create uneven temperatures and make the refrigeration system work harder.

If you need greater capacity, compare the 40ft refrigerated container. For goods that do not need temperature control, a 20ft standard shipping container may be the simpler option.

20ft refrigerated container dimensions and capacity

Refrigerated containers have less usable internal space than equivalent dry containers because insulation and refrigeration equipment take up part of the box. Check internal dimensions, door opening and payload before planning pallet layouts or dense loads.

Specification Metric Imperial
External length 6.058 m 20 ft 0 in
External width 2.438 m 8 ft 0 in
External height 2.591 m 8 ft 6 in
Internal length 5.440 m 17 ft 10 in
Internal width 2.286 m 7 ft 6 in
Internal height to red load line 2.250 m 7 ft 4.5 in
Door opening width 2.286 m 7 ft 6 in
Door opening height 2.210 m 7 ft 3 in
Internal volume 28.3 m³ 1,000 cu ft
Maximum gross mass 30,480 kg 67,200 lb
Approximate tare weight 3,050 kg 6,720 lb
Maximum payload 27,430 kg 60,480 lb

The red load line inside the container marks the upper loading limit needed to preserve the return-air path. Loading above it can restrict circulation and lead to uneven temperatures. The same principle applies around the floor channels: the refrigeration system relies on air being able to move through the container rather than being trapped by tightly packed stock.

For a broader comparison of container dimensions, see the shipping container size guide.

Buying or hiring a 20ft reefer

Buying suits long-term cold storage, regular operational use and projects where you expect to keep the container after the immediate requirement ends. Ownership also gives more flexibility where permanent modifications are planned, subject to the effect those alterations may have on the container’s future use.

Hire can suit seasonal peaks, temporary cold-storage requirements and projects with a defined end date. It also avoids having to decide what to do with the container afterwards. Hire agreements may restrict alterations, and responsibility for damage, collection access and the condition of the unit at off-hire should be checked before use.

If your requirement may only last for a limited period, compare purchase with 20ft refrigerated container hire. The buying versus hiring guide can also help when weighing duration, future use and the practical differences between ownership and hire.

Condition and inspection of refrigerated containers

Condition matters more with a reefer than appearance alone. The container body, doors, seals, floor, refrigeration machinery, fans and controller all affect how the unit performs. Ask what has been inspected and tested rather than relying only on a grade description.

One-trip refrigerated containers

A one-trip unit normally describes a container that has completed a single cargo journey after manufacture. It will generally show less wear than an older used reefer, although individual condition still needs to be checked.

Used and cargo-worthy reefers

Used refrigerated containers can show cosmetic wear while remaining suitable for their intended purpose. A Pre-Trip Inspection, often shortened to PTI, is used to check refrigeration functions before operation or transport. The scope and timing of any inspection should be confirmed for the individual unit.

IICL and CSC status

IICL refers to inspection and repair criteria used within the container leasing industry. It should not be treated as a guarantee of age, appearance or suitability for every application.

A CSC plate relates to approval for international transport. If the container may travel by sea, check that its approval status, structural condition and inspection position meet the requirements of the intended carrier. A plate being physically present does not by itself confirm that a container will be accepted for a particular movement.

The container condition guide gives more detail on the terminology used when comparing containers.

Electrical supply and day-to-day operation

The supplied specification calls for a dedicated 32-Amp, three-phase 440V electrical supply. Before ordering, confirm that the required power is available at the intended position and that the connection can be made safely by a suitably qualified electrician.

Plan the electrical point around the machinery end of the container so cables do not create an avoidable obstruction around doors, vehicle routes or working areas. If the container may later move elsewhere on the site, check that the new position can provide the same power arrangement.

The operating temperature range stated for these units is from -25°C to +25°C. Actual suitability depends on the goods, machinery, loading pattern and operating requirements, so confirm the required set point and product conditions before use.

Reefers depend on continuous airflow. Goods should not block the T-bar floor channels or the return-air path above the load. Pre-chilled goods should also be loaded in a way that allows cold air to move through and around the cargo rather than being trapped between tightly packed items.

Delivery, access and placement

A 20ft reefer is heavier than an equivalent dry container, so the delivery route and final position need to be checked before transport is arranged. Send clear site information at the enquiry stage rather than assuming a HIAB vehicle can reach and place the unit.

A HIAB is a lorry-mounted crane used to lift a container from the delivery vehicle and position it on site. The truck needs enough room to approach, stabilise and carry out the lift safely. Crane reach, ground strength and nearby obstructions all affect whether the planned position is practical.

Check the site before ordering.

  • Measure entrance and gate width.
  • Check turning and reversing space.
  • Identify cables, branches, building eaves and other overhead obstructions.
  • Confirm that the approach and offload area can support the delivery vehicle.
  • Show the supplier the intended container position and machinery-end orientation.
  • Allow for future access if the unit may need to be collected or moved.

Place the container on firm, level support at the corner castings. Soft or uneven ground can settle and twist the frame. Once the container is out of square, heavy reefer doors may become difficult to operate, and seals may no longer sit correctly.

Concrete, suitable hardstanding or properly prepared supports can help keep the container level while allowing drainage around the base. The exact arrangement should suit the site and the weight being supported.

See the container delivery guide for more information on access, HIAB placement and preparing the set-down area.

Loading, airflow and condensation

A refrigerated container controls temperature, but correct loading still matters. The machinery cannot compensate for blocked airflow or unsuitable cargo preparation.

Keep goods below the red load line and maintain clear routes for air to move through the T-bar floor. Pallet and stock layouts should allow circulation rather than forming a solid wall across the interior.

Door opening also affects temperature stability. Frequent or prolonged opening lets warmer outside air and moisture enter the container. That can increase the load on the refrigeration machinery and contribute to frost or ice around cold surfaces.

Check door seals regularly and keep the doorway clear of debris that could prevent the doors from closing correctly. If shelving or other internal alterations are planned, make sure they do not obstruct the air path or reduce safe loading space. The container loading guide covers practical loading considerations in more detail.

Using a 20ft refrigerated container for export

If the reefer will carry cargo internationally, confirm export suitability before purchase. Storage use and marine transport place different requirements on the container, so a unit that works well as a static cold store should not automatically be assumed suitable for a shipping line.

Check the container’s CSC status, maximum gross mass, tare and payload against the intended load. Verified Gross Mass requirements, customs documentation, carrier instructions and cargo-specific rules may also apply to the shipment.

International movements can involve Incoterms 2020, insurance, customs responsibility, delays, storage charges, detention and demurrage. These matters depend on the shipment and contracts involved. Check them with the relevant freight forwarder, customs agent, shipping line, insurer or professional adviser rather than relying on the container specification alone.

If Incoterms form part of the sale or shipping arrangement, the Incoterms 2020 guide provides a useful starting point for understanding how responsibilities may be divided between parties.

What to check before ordering

  1. Confirm the goods to be stored and the operating temperature required.
  2. Check that a suitable three-phase electrical supply can be provided at the container position.
  3. Confirm that a 20ft reefer gives enough usable internal space after allowing for airflow.
  4. Decide whether purchase or hire better matches the expected period of use.
  5. Ask what condition checks and refrigeration tests have been carried out on the individual unit.
  6. Measure the site entrance, route, turning area and proposed set-down position.
  7. Prepare firm, level support at the final location.
  8. Tell the supplier if the container may later be used for international transport.

Include the delivery postcode, site photographs, access measurements, required operating temperature and intended use when requesting a quotation. These details help establish the right container, delivery method and site preparation before the unit is moved.

Once those details are ready, use the container quote page to submit the requirement.

Easy Ordering Process

A simple 4-step process from quote request to delivery.

01

Make an enquiry

Please tell us what you need, how you plan to use the container, and where it needs to go.

02

We will email your quote

We review your requirements and send you a quotation based on size, type, condition, location and delivery access.

03

Confirm your order

Approve the quote and delivery details, and we’ll book everything in for you.

04

Delivery

Your container is delivered on the agreed date and placed where required on site.

logo

167-169 Great Portland Street
London
W1W 5PF
0330 027 1420
info@acorncontainers.co.uk

VAT No: GB 474349661
Company No: 15538980